specification section 16010

Back to Blog

specification section 16010

#Zkh f9\!A>V=#JM;:Dw. Services include: Electrical penetrations include conduits and cables. Listing and Labeling: Provide products specified in this Section that are listed and labeled. B. Patch holes and penetrations in wood, masonry and plaster. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. "$u D2iH>`:\ &Ea Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. hbbd``b` $Z ~BARD0 !LAF10t' Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. Outages should be scheduled a minimum of ten (10) days in advance. IT System. For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. Access panels and doors are specified in the Architectural Specifications. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. 264 0 obj <> endobj Hazards. Job No. Sizes and location of required concrete pads and bases. 2020 0 obj <>stream left on top of ceilings and ceiling tiles. 1.01 . 0 PROJECT PUNCH OUT Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out. Fire rated wall and floor penetrations. Job site and worker safety are the responsibility of the contractor. ph p h8 B* BASIC ELECTRICAL REQUIREMENTS . HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. Obtain all necessary permits from endstream endobj 4189 0 obj <. Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope. %PDF-1.6 % ph p hf h8 >*B* No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream hmo Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Copy of Maryland Master Electrician's License. Reimbursement shall be made by deducting the Architect/Engineer fee from the Contractor's final payment. The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. 0 containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. ']xOs 0LSJ$C}q]7#y6t hs.%7fu 7~[2{& x ](>B|>LWwiy=>,?^": endobj At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. ELECTRICAL GENERAL PROVISIONS . These cookies do not store any personal information. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. P}a WNd|2Svk=vq!xKv!`,8h@ ` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY The Engineer shall decide on the item and manner in which the work shall be provided. Coordinated Drawings: pdf or dwg file formats. Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. The contractor shall submit detailed riser diagrams detailing point-by-point connections. CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. 16010. Comply with manufacturer's instructions. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . @W|$" Make all necessary investigations as to locations of utilities and all other matters which can affect the work. IL?nL"a n[. HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. 1 0 obj Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. Servicing. SECTION 16010 - GENERAL PROVISIONS. 4206 0 obj <>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream 590 0 obj <>stream GROUTING Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. Concrete shall be 3,500 psi twenty-eight (28) day compressive strength concrete and reinforcement bars as specified in the architectural specifications. 4284 0 obj <>stream Place grout around anchors. F. Supply Voltage Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z The work plan must include procedures to be used on and near the live electrical equipment, barriers to be installed, and safety equipment to be used and exit pathways. Local or State license where required. PROTECTION OF WORK Protect work, material and equipment from weather and construction operations before and after installation. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. Maintenance agreements and similar continuing commitments. unless otherwise noted. xref Preliminary programming information. xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. Also turn off Underlines.) CA-1817 / PN15160009 16010 - 1 DIVISION 16 - ELECTRICAL SECTION 16010 - GENERAL ELECTRICAL PROVISIONS PART 1 - GENERAL 1.01 INTENT OF SPECIFICATIONS AND DRAWINGS A. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. NETA (National Electrical Testing Association). B. [l*/ Power Distribution System. Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. Distribution panels. Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. L1)Tj4d v"1s%H"r$-j` ,}# ADA (American with Disabilities Act). M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 xb```f``Z$31 P9&0`(*k^?f(]A 33$M?sOXiU>0seuA[!TC@EBt[lytx*%g K NZI9D&\m; ,fNgr\ r9T^LUYn~K6F.%ragg,n:a9id""$M])2bISPyb`6``:EZc `2p%KGS;^eNLM\|j P}e`N 0o2304@ KB <<8444751DFCD0354687F9FE76EBE71065>]>> All other materials removed shall become the property of the Contractor and shall be removed from the premises. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. The following list shall be used as a guide only: Equipment such as transformers, generators, etc. B. 2006 0 obj <> endobj Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. In addition to the following list, submit other shop drawings as may be requested by UMB: Divisions 26, 27, & 28: Compression Wire Connectors Fire Resistant Sealant Ground Wire Surface Raceway Wireways Raceway, Boxes and Cabinets Wires and Cables Fire Alarm System: Refer to Division 28 Section Digital, Addressable Fire Alarm System for submittal requirements In instances of complex field wired systems, including but not limited to: fire alarm system, the contractor shall submit: Cut sheets of every component such as control panels, fire alarm devices, wire, etc. endstream endobj 265 0 obj<> endobj 266 0 obj<>/Encoding<>>>>> endobj 267 0 obj<> endobj 268 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 269 0 obj<> endobj 270 0 obj<> endobj 271 0 obj<> endobj 272 0 obj<> endobj 273 0 obj<> endobj 274 0 obj<> endobj 275 0 obj<> endobj 276 0 obj<>stream c $ ) p@P ! CUTTING AND PATCHING General: Perform cutting and patching in accordance with Division 1 Section "Cutting and Patching." Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Coordinate installation of large equipment requiring positioning prior to closing in the building. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. Test data for equipment, shielded cables and supply voltage shall be submitted to the District. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? SUBMITTALS General: For general requirements see Architectural Specification Division 01 Section "Submittal Procedures". CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. %%EOF <> to a point below the finished floors or behind finished walls and cap. This category only includes cookies that ensures basic functionalities and security features of the website. See Specification Division 01 for general requirements. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. Cure placed grout according to manufacturer's printed instructions. Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . Related Specification Sections include, but are not limited to, the following: 1. Both riser and floor plan shall indicate address of devices where applicable. These cookies will be stored in your browser only with your consent. BICSI and NICET certification, where required by these specifications. hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ All such outages shall be performed on other than normal duty hours. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. Section 16151 - Vertical Hollowshaft Electric Motors . 0000005420 00000 n Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. Reflected ceiling plan. 1912 0 obj <>stream In default thereof, owner may have such work done and charge the cost of same to the contractor. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. 2.0 GENERAL DESCRIPTION: A. Schedule the preliminary and rough-in inspections in a timely manner. hVk0W=}Xl(&[Xa+ KLbHblwwdM-/cH/Iw?GJec&2%i0h2e5 }7$kFq$$2/[&4{MXymnX*paLB:lWl_-]'vYt./&veAy[rozmIted7m-z3mdSNr]McVEEy]6uN7Y G#ps(cG-RAUi,K(#XE\X* Vx\Qc `V)3KR$$%[.gg{q0he`H\b$8kP}}@Q }RVyO@T.T.tg11IQjxAFLi=d;k7H- 0000002433 00000 n It is mandatory to procure user consent prior to running these cookies on your website. Corresponding floor plans showing only this particular system with conduit and wire runs between points. 4. product data and shall indicate applicable specification section and item numbers. &F >`>a$gd$ ^ gd;F $ C. (Engineer shall edit specifications and blue text in header to meet project requirements. Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. Tools. %PDF-1.5 % Control. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. Any defects in workmanship, materials, or performance which appear within the guarantee period shall be corrected by the contractor without cost to the owner, within a reasonable time, to be specified by UMB. }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 Disconnect installed work as specified for testing. endstream endobj 575 0 obj <>stream Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. o Place markers in corner of tile. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. Trouble shooting. . Submit the work permit with the outage request. Effective energy utilization. As part of instruction for operating equipment, demonstrate the following procedures: Start up. FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. Provide service and operating manuals for the following: Division 28 Section Digital, Addressable Fire Alarm System. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. l!j=MO_Q7 ze|M|+LUQYm9J]o[_UfO^U|o5_`e::,k?3R j{`11rW{b@{Lw?mcrfc~b l vrOl-~jbG6+)JTz3{ {{.j~@+rin2A:SG!=,wB`q!NU mYfXR{Y Part Number 16010, Narrow Section Ball Bearings (16000, 16100). .2 Section 01810 -Commissioning. 0000003331 00000 n State of Maryland Fire Prevention Code. 1.1 GENERAL. Single strip, continuous, flexible interlocked, double-wrapped steel, galvanized inside andoutside, forming smooth internal wiring channel. **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 Install equipment and materials in existing structures. Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. EN. PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting All communication shall be through this person. Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. 0000002587 00000 n Disconnects. Remove conduit, hangers, supports, etc. Diagrams shall indicate cable on raceway between points. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. SECTION 16010 . Size and location of all electrical panels. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Necessary cookies are absolutely essential for the website to function properly. It shall be the responsibility of the Installer to obtain all necessary data from the equipment supplied under other Divisions. Replace ceiling tiles where removal has left holes or cuts in original tiles. Exterior wall and foundation penetrations. YKY%+~GPtWx@@nZJ |9!H!7/"-m_1H0Nb+y Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. For each electrical outage request include a photograph of the panel index schedule for each panel affected by the outage. Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. With super-finished raceways and controlled geometries, our premium design helps ensure consistent quality. Noise and vibration adjustments. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. 278 0 obj<>stream 2 0 obj Notify UMB in advance of scheduled inspections. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. hb```,lleaX 0p7Q;0"cuLfJ 'f`^a]Qp@q 2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p 264 15 For equipment requiring seasonal operation, perform instructions for other seasons at the same time. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. ` I are not concealed by new work. h. endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream 1.1 GENERAL REQUIREMENTS: A. hbbd```b`` The drawings and specifications shall be followed in layout of work. The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. Examples of Sub Systems: Normal Power. Switch Gear. 0000000596 00000 n hVKk@+{la b64j[`KARh3Vd$U!XLa 'f:dM%wwc@%nyS^7-ZygHmnH"*pEK&xD,wb76I]VGm)Z_j@vUMmuyhxy S[{_T ,((n&+~z?h~YrM`%Rb$I"s?)s #: +}[6 #F7fWnV={RvRz&QQ A`5~o4lo SI*XU'wSB$5)|9D xb 1mfaqs7&YDE/q$"B" Afp|ISKCyd: C#S `IzLCoqw^`rSG7*V VF7A,.V4P l#o{# in9E^mj`PcuVd5 Maximum length: (six 6) feet, except where fished. NEMA (National Electrical Manufacturers Association). Samples shall include physical examples of materials; in complete units for visual inspection. Maintenance. Motor manufacturer, motor type or model . Engage the services of the Structural or General Contractor, and pay for them, to provide the concrete housekeeping pads. Comply with the following requirements: Coordinate electrical systems, equipment, and materials installation with other building components. Division 16 Electrical SECTION 16010 - GENERAL PROVISIONS After such approvals, the CONTRACTOR shall submit the CADD- generated as-built originals, three (3) sets of prints and two (2) sets of electronic files to the CONSULTANT, as well as three (3) sets of operating and maintenance instructions, equipment and parts lists, including addresses of Access doors. 3 electrical and mechanical specifications, specifications for electrical unit substation . Safety procedures. Refer to contract drawings where access panels have been specifically located. Packaging: Premixed and factorypackaged. Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. But opting out of some of these cookies may have an effect on your browsing experience. 896 0 obj <>/Filter/FlateDecode/ID[<4733E1E0B7D7784ABE416F9437B1A7ED><5C11778FF49F854BA974624463381FF3>]/Index[878 27]/Info 877 0 R/Length 92/Prev 228199/Root 879 0 R/Size 905/Type/XRef/W[1 3 1]>>stream . Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. %%EOF View Specification PDF - The Pennsylvania Turnpike. endstream endobj startxref Only one submission per System Integrator will be allowed. In addition to the requirements specified in Division 1, the following requirements apply: Protection of Installed Work: During cutting and patching operations, protect adjacent installations. _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. Samples shall indicate applicable specification The hot work permit copy shall remain on the job site at the hot work location until such work is completed at which time the permit shall be returned to Environmental Health and Safety. Economy and efficiency adjustments. endstream endobj 879 0 obj <. 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel .

Indra Nooyi Brother Narayanan, Mastec Acquisitions 2021, Yao Ming Hand Size, $15 Van Service From Allentown, Pa To Ny, Articles S

specification section 16010

specification section 16010

Back to Blog